- 1989-90, and
cancelled those under construction. The
earliest VVERs were
built before 1970. The
VVER-440
Model V230 was the most
common design,
delivering 440...
-
reactor based on
VVER technology developed by Rosatom. The
VVER-TOI
design is
intended to
improve the
competitiveness of
Russian VVER technology in international...
-
built Kursk 5 and
Kursk 6
units which had
construction halted, and two new
VVER-TOI
designs (Kursk II-1 and
Kursk II-2) are
under construction. The International...
-
standards of
control and instrumentation.
Present generations of
VVERs (starting from the
VVER-1000) are
built to Western-equivalent
levels of instrumentation...
- [citation needed] In fact,
Chernobyl had RBMKs, and Temelín
would have
VVERs.[citation needed] The
Czech President at the time, Václav Havel, called...
-
currently under construction in Bangladesh. It
consists of two 1200 MWe
VVER-1200 reactors. The
nuclear power plant is
being constructed at
Rooppur in...
-
before closure shortly after the
German reunification. The
plants were of the
VVER-440/V-230 type,
which was the
second generation of Soviet-designed plants...
-
power units with
Russian VVER-TOI
reactor installations.
Power Units No. 7 and No. 8 of the
Leningrad NPP-2,
equipped with
VVER-1200 reactors, are being...
- Hungary's
electricity production.
VVER is the
Soviet designation for a
pressurized water reactor. The
number following VVER, in this case 440, represents...
- is a
nuclear plant in
Ukraine in
Rivne Oblast,
which operates the
first VVER-440
reactors to be
constructed in Ukraine. The
Regulatory Committee of Ukraine...