- A
railway track (CwthE and UIC terminology) or
railroad track (NAmE), also
known as
permanent way (CwthE) or "P Way" (BrE and
Indian English), is the structure...
-
replaced by the
permanent way at completion, thus
explaining the term "
Perway". The
vehicles or
traffic using a
tunnel can
outgrow it,
requiring replacement...
-
replaced by the
permanent way at completion, thus
explaining the term "
Perway". The
vehicles or
traffic using a
tunnel can
outgrow it,
requiring replacement...
-
platform is
located on the main line;
there is an
active p****ing loop and
perway siding beside it. In the late 1920s, it was
decided by the then New South...
-
sidings and
refuges around Campbelltown. Some of
these sidings, such as the
perway siding and the
goods siding (the two dead ends
north of the station), are...
- on the main line.
There is a still-operational p****ing loop opposite; a
perway siding is
located to the west.
Platform looking east
Platform looking west...
- at the
Cooks River, a
single line led over the
river to the
Wolli Cr****
Perway Yard. The line
reached St
Peters as a
steam tramway in 1891, then to Cooks...
-
interlocking and
process control systems 2001: (VAE
systems acquires Transwerk Perway Pty. Ltd (South Africa),
railroad switch manufacturer) 2002: P****enger information...
-
Workshops at
Redfern and in
other railway buildings in New
South Wales e.g. the
PerWay Store at
Honeysuckle Point and the Blacksmith's Shop at Bathurst. The site...
-
County Reserves 1911-12
Garston North End
Skelmersdale United L & N.W.R.
Perway Prescot Swifts 1912-13
Garston Gasworks Prescot Wireworks 1913-14 Skelmersdale...