-
Vestas in 2004
Nordex (1985–present) —
moved to
Germany Nordtank Energy Group (NEG),
formerly Nordtank (1980–1997) —
merged with
Micon in 1997
Siemens Wind...
-
turbine manufacturer. It was
formed in 1997 as a
result of a
merger between Nordtank Energy Group (NEG) and
Moerup Industrial Windmill Construction Company...
- Mineralölhandel AG. This
company had
three daughter companies selling fuel:
Minol Nordtank GmbH in
Rostock Minol Zentraltank GmbH in
Potsdam Minol Südtank GmbH in...
- that have been
captured on film.[citation needed] The wind
turbine was a
Nordtank NTK 600-180/43 with a
maximum generation capacity of 600 kW at Hornslet...
-
Hutterite colony in Martinsdale, Montana, with an
array of
reconditioned Nordtank wind turbines...
-
Hutterite colony outside of
Martinsdale with an
array of
reconditioned Nordtank wind
turbines Martinsdale Show map of
Montana Martinsdale Show map of the...
-
serial production of wind
turbines by
Danish manufacturers Kuriant, Vestas,
Nordtank, and Bonus.
These early turbines were
small by today's standards, with...
-
installing a Nord Tank NTK-500/37 wind turbine. They
added other products of
Nordtank such as NTK-300/35 and NTK-550/42. The
developer was Iran
Renewable energies...
-
serial production of wind
turbines by
Danish manufacturers Kuriant, Vestas,
Nordtank, and Bonus. Initially, most of
these early turbines were
installed in western...
- 55°02′00″N 06°15′24″W / 55.03333°N 6.25667°W / 55.03333; -6.25667 (Corkey)
Nordtank NTK500 0.50 10 5.00 1994 RES Ltd and B9
Energy B9
Energy ScottishPower...