- 9
MMTPA crude distillation unit, 4.8
MMTPA vacuum distillation unit, 1.8
MMTPA naphtha hydrotreater unit, a
diesel hydrotreater unit at 4.1
MMTPA, a...
- Group. It is
headquartered at Noida,
Uttar Pradesh and
operates the 11.3
MMTPA Guru
Gobind Singh Refinery (GGSR) at Bathinda, Punjab. HPCL-Mittal Energy...
- and
modern building materials (MBM), with an
installed capacity of 25
MMTPA.
Nuvoco is the part of the
Nirma Group conglomerate,
entered the cement...
- all-weather
working port in Tuna Village, Gujarat,
India with
capacity of 14
MMTPA. The port is
located 15 KM from
existing Kandla Port on
South West direction...
-
Corporation Limited Owner(s) HPCL and
Mittal Energy Investment Pvt Ltd,
Singapore Commissioned March 2012 (March 2012)
Capacity 11.3
MMTPA in FY 2017-18...
- indianexpress.com. "Gujarat govt to set up two new LNG
terminals of 10
MMTPA".
India News
Analysis Opinions on Niti Central.
Archived from the original...
- / 27.39083°N 95.61861°E / 27.39083; 95.61861
Refinery details Owner(s)
Indian Oil
Corporation Limited Commissioned 1901 (1901)
Capacity 0.65
MMTPA...
- The Port will have an
initial cargo capacity of 35
million tonnes (35
MMTPA),
through four berths-three
general cargo berths and one coal terminal....
-
construction of the port, with an
initial cargo capacity of 35
million tonnes (35
MMTPA),
through four berths-three
general cargo berths and one coal terminal....
- 160444°N 80.277528°E / 13.160444; 80.277528
Refinery details Owner(s)
Chennai Petroleum Corporation Limited Commissioned 1969 (1969)
Capacity 10.5
MMTPA...