behalf of G****co. The
Kollsnes plant processes the
natural gas from the Troll, Kvitebjørn, and
Visund gas fields.
Kollsnes has a
capacity of 143,000...
-
processing plant at
Kollsnes forms part of the
Troll Gas development, and
became operational on 1
October 1996. The
processing capacity at
Kollsnes has been increased...
- at
Kollsnes in Norway. The HVDC
Troll has a
maximum transmission rate of 84 megawatt. In 2013 work
started on a new
rectifier station at
Kollsnes for...
-
blocks 31/2, 31/3, 31/5 and 31/6,
about 65
kilometres (40 mi) west of
Kollsnes, near Bergen. Most of the gas lies in
Troll East. The
field is operated...
-
wells and is
exported through a
number of
pipes to a
processing plant at
Kollsnes.
Troll A is
scheduled to
receive two
additional gas compressors[when?]...
- pipeline,
Norne Gas
Transport System,
Langeled pipeline and terminal, and
Kollsnes gas
processing plant were
merged into G****led. "Gas milestone". Upstream...
-
station located at Kårstø. It also
holds a
permit to
build a
second one at
Kollsnes. The
company is
owned by
Statoil and Statkraft, with 50% each. The company...
- Frøland, Grønsdal, ****andfoss, Herlandsfoss, Hommelfoss, Kløvtveit,
Kollsnes cogenereation plant, Kvittingen, Lundsæter, Matre, Myra, Myster, Møllefossen...
-
Substation 2
Length (km)
Voltage (kV)
Power (MW)
Operational Remarks HVDC
Troll Kollsnes Troll A
platform 70 60 80 2004 unidirectional,
submarine HVDC
Valhall HVDC...
- 1996, is 303
kilometres (188 mi) long 40-inch (1,000 mm)
pipeline from
Kollsnes gas
processing plant in
Norway to
Sleipner Riser. The