-
Danish demands.
Responsible for the
design and
construction was the
Ingenieurkontor Lübeck (IKL)
headed by
Ulrich Gabler.
These last two
boats were built...
- U-boat
classes XXII, XVII A and XXVI.
After the war he
founded the
Ingenieurkontor Lübeck (IKL)
which among others designed the type 201, 202, 205 and...
- the
Democratic Republic of the
Congo Postal code for Iklin,
Malta Ingenieurkontor Lübeck, a
German shipbuilding company Ingolstadt–Kralupy–Litvínov pipeline...
-
reasonable price and
economy of operation. The
submarine was
designed by
Ingenieurkontor Lübeck (IKL)
headed by
Ulrich Gabler and is
largely based on previous...
- 205 submarines.
Responsible for the
design and
construction was the
Ingenieurkontor Lübeck (IKL)
headed by
Ulrich Gabler. The
price per unit was around...
- submarines.
Design of
these very
small submarines started in 1957 by
Ingenieurkontor Lübeck (IKL). It was
intended to
build 40 Type 202 mini submarines...
-
November 1977 and
completed on 18
March 1981. The
vessel was
designed by
Ingenieurkontor Lübeck of Lübeck,
constructed by Howaldtswerke-Deutsche
Werft of Kiel...
-
Garcia Shipyard (Tandanor). The Type 209
submarine was
designed by
Ingenieurkontor Lübeck (IKL)
headed by
Ulrich Gabler and is
largely based on previous...
-
submarine and its
sister vessel, KRI Cakra. The
vessel was
designed by
Ingenieurkontor Lübeck of Lübeck,
constructed by Howaldtswerke-Deutsche
Werft of Kiel...
- The Cakra-class
submarines were
ordered on 2
April 1977,
designed by
Ingenieurkontor Lübeck of Lübeck,
constructed by Howaldtswerke-Deutsche
Werft of Kiel...