- opens. 3
April 1898:
Iwaki Line (
Haranomachi — Nakamura)
begins operation. 11 May 1898:
Iwaki Line (Odaka —
Haranomachi)
begins operation. 6
August 1898:...
-
Haranomachi Station (原ノ町駅,
Haranomachi-eki) is a
railway station in the city of Minamisōma, ****ushima, ****an,
operated by East ****an
Railway Company (JR...
- Rikuzen-
Haranomachi Station (陸前原ノ町駅, Rikuzen-
Haranomachi-eki) is an
underground railway station in Miyagino-ku in Sendai, Miyagi, ****an
operated by East...
-
plants were damaged.
These include Sendai #4, New-Sendai #1 and #2,
Haranomachi #1 and #2,
Hirono #2 and #4 and
Hitachinaka #1. The ****ushima Daiichi...
-
Individual opening dates are
given in the
timeline section below. The Rikuzen-
Haranomachi to Nishi-Shiogama
section was double-tracked
between 1968 and 1969, and...
-
Senseki Line: Aoba-dōri –
Sendai –
Tsutsujigaoka –
Miyaginohara – Rikuzen-
Haranomachi –
Nigatake –
Kozurushinden – ****udamachi – Rikuzen-Takasago – Nakanosakae...
-
blocked for non-authorized
traffic between Hirono (the
Iwaki side) and
Haranomachi (the Sōma side). The ban was
lifted in
September 2014
after the road...
-
Preceding station JR East
Following station ****aba
towards Shinagawa Hitachi Haranomachi towards Sendai Jōban Line Local-****suu
Momouchi towards Sendai...
- to
Platform 11.
Estimated date of
completion is 2026. For Minamisōma,
Haranomachi Station,
Kashima Station (****ushima) For Sōma For Nihonmatsu, Koriyama...
-
Preceding station JR East
Following station Rikuzen-
Haranomachi towards Aoba-dori
Senseki Line
Kozurushinden towards Ishinomaki...