- France: 100% of EDF Énergies
Nouvelles which in turn owns EDF-RE,
formerly EnXco in US, 74.86% Électricité de Strasbourg, 67%
Dalkia Investments, 51% TIRU...
- the project,
which had
already received all the
required permits, from
enXco in May 2005.
Construction started in
August 2005 and
completed in April...
- The
Fenton Wind Farm is a 205.5
megawatt wind
energy project built by
enXco (now EDF Renewables), that
became operational in the
second half of 2007....
- of power.
Hoosier Wind Farm is a
joint venture between AES
Indiana and
enXco, and has a
nameplate capacity of 106 MW of power. "IPL
changes name to AES...
- in 2016–17. In
September 2002
SeaScape Energy (
Zilkha Renewable Energy,
enXco A/S, Wind
Prospect Ltd.
joint venture.)
submitted an
application to develop...
-
Indiana Michigan Power Hoosier Benton REpower 2 53 106 2009-08 IPL,
enXco IPL,
enXco IPL
Indiana Crossroads I
White Vestas V150 4.2 72 302.4 2021-12 EDP...
-
Archived from the
original on
February 17, 2017.
Retrieved February 16, 2017. "
enXco Closes Financing on
Shiloh II Wind Project". renewableenergyworld.com. Archived...
-
power station located near Bakersfield, Kern County, California,
owned by
enXco, an EDF Énergies
Nouvelles Company. It
covers an area of 445
hectares (1...
- 40.6; -87.32 ("Hoosier Wind Farm")
REpower 2 53 106 2009-08 IPL,
enXco IPL,
enXco IPL
Indiana Crossroads I
White Vestas V150 4.2 72 302.4 2021-12 EDP...
-
REpower 2 MW wind turbines, for a
total nameplate capacity of 106 MW. The
enXco subsidiary of EDF
Energies Nouvelles built the wind farm, with Mortenson...