-
Salzungen OT-
Bauleitung Road
construction Bad
Salzungen II Bad
Salzungen OT-Sonder-
Bauleitung Potash mining Bensberg Bergisch Gladbach OT-
Bauleitung Construction...
-
Basic construction sector Oberbauleitung under Oberbauleiter. Sub-sector
Bauleitung Local control Abschnittsbauleitung Construction site
Baustelle Intra German...
- Wissenschaftsverlag. pp. 560 ff. ISBN 3-486-57759-X.
Schreiben der Zentral-
Bauleitung der Waffen-SS und Polizei-Auschwitz O/S an Huta Hoch- und Tiefbau-A.G...
-
metres of
shelves of
records from the camp's
construction department (
Bauleitung); and
another 15
metres of do****ents from the camp itself, such as SS...
-
required two DAG
construction offices to be established:
Bauleitung I (western part) and
Bauleitung II (eastern part).
Construction and ****embly
works started...
- Halle-Siebel or Birkhahn-Mötzlich camp.
Laborers were also
provided to the "
Bauleitung Professor Doktor Ingenieur Rimpl,
Kostenstell B-XII". At a cost of six/four...
- (Feldbauamt), and at the
local air base by its
Works Superintendent's
Office (
Bauleitung),
composed of
technical military officials. On the
Luftgau level, a special...
- 794
Glasau District Segeberg 29
March 1945 – 2 May 1945 466
Goslar SS–
Bauleitung Goslar (Not
Goslar subcamp to Buchenwald) 20
October 1944 – 25
March 1945...
- gas chambers,
which originated from the ****
German office of
Zentral Bauleitung der
Waffen SS.
Museum staff provided him with ****istance,
convinced of...
- Auschwitz-Birkenau
State Museum, Oświęcim 2022, ISBN 978-83-7704-366-0.
Auschwitz Bauleitung.
Designing a
Death Camp. Proj****wanie
Obozu Śmierci, Auschwitz-Birkenau...