- runs on standard-gauge tracks.
Bengaluru Metro Rail
Corporation Limited (
BMRCL), a
joint venture of the
Government of
India and the
State Government of...
-
acquisition for
Phase I of the
project cost ₹2,500
crore (US$290 million).
BMRCL secured ₹6,500
crore (US$740 million)
through long-term
loans and ₹300 crore...
-
Nagawara and with the ****ure /proposed
Orange Line at Hebbal. In June 2022,
BMRCL launched the
first ever U
Girder span on ORR-Airport
metro line. The extension...
-
BMRCL planned to
build a line in the
southern end of the city to
connect it to the
industrial areas of
Bommasandra and
Electronic City. In 2012
BMRCL...
- The
system is
operated by the
Bangalore Metro Rail
Corporation Limited (
BMRCL). On 25
March 2023, a new
section of the
Purple Line from Krishnara****ura...
- (US$57 million). KSRTC, the
state inter-city bus
transport agency,
provided BMRCL with 20
acres of land for
construction of the station,
slightly over half...
-
after a
renowned electronics company located nearby after an
agreement with
BMRCL. As per
latest reports, the
Yellow Line is
slated to be
operational around...
- The
first section of
Green Line was
opened to
public on 1
March 2014.
BMRCL Managing Director Pradeep Singh Kharola stated that
about 25,000 p****engers...
-
Later in June 2013
BMRCL partnered with
RITED Limited to
conduct a pre-feasibility
study for each
proposed corridor By 2016,
BMRCL submitted its Phase-III...
-
crore (US$1.3 billion) in
March 2017 (most
expensive line in
Phase ll).
BMRCL initially floated tenders for the
construction of the 13.9 km (8.6 mi) underground...