-
change of
timetable on
December 13, 2020, ECE
trains operated by ETR 610 "
Astoro"
began service on the
partially new
electrified line
between Munich and...
- The
Solar System Allied Forces have
entrusted their Warrior,
aboard The
Astoro Raider, to
attack the
invasion force and
destroy their mother ship. The...
- Lötschberg Base
Tunnel to Frankfurt. In 2018, the
fleet was
rebranded as
Astoro following a refurbishment. In
January 2023, the SBB
announced a SFr 120m...
- hours,
replacing EuroCity line 88. It is
operated with
Alstom ETR 610 (
Astoro) sets of the
Swiss Federal Railways. Line 89 was
reintroduced with the timetable...
-
Alstom New
Pendolino RABe 503 011-022 2012-2017 12 12 250 5500
Called "
Astoro", used for
international routes to
Italy and Germany. Also
called "Cisalpino...
-
Retrieved 12 May 2024. Artymiuk,
Simon (18
January 2023). "SBB
begins Astoro tilting train refurbishment".
International Railway Journal. Derailment...
- two
hours and are
operated by
Swiss Federal Railways with
Alstom ETR 610 (
Astoro) sets. In addition, ICE
Trains to
London via the
Channel Tunnel are on the...
- 35°43′21″N 138°26′21″E / 35.72250°N 138.43917°E / 35.72250; 138.43917
Owner Nirasaki City
Capacity 4,000
Surface Natural gr****
Tenants Nirasaki Astoros...
- Buchloe,
Memmingen and
Lindau have been
operated by SBB
using ETR 610 "
Astoro" (New Pendolino) sets in
cooperation with DB. Most of the
regional trains...
- and
Zurich since 13
December 2020. ETR 610
class electric multiple units (
Astoro) of the SBB are used. In the 2021 timetable, the Munich–Buchloe line is...