- Govt.. The
government reforms in
power sector led to the
formation of
APGENCO on 28
December 1998 and
commenced operations from 1
February 1999. The...
- 1998. The
erstwhile APSEB was
unbundled into one
generating company (
APGENCO), one
transmission company (APTRANSCO) and four
distribution companies...
- body.
APGENCO deals with the
electricity production and also maintenance,
proposes new
projects and
upgrades existing ones as well. The
APGENCO also set...
-
Andhra Pradesh. The
power plant is one of the coal
based power plants of
APGENCO. The
Thermal Power Station has a
capacity of 1650 MW; 5
units of 210 MW...
-
Electricity board. The
power plant is one of the coal-based
power plants of
APGENCO. It is well
placed between Ibrahimpatnam and
Kondapalli villages. Dr Narla...
- (APPDCL). It is the
Special Purpose Vehicle (SPV), a
joint venture company of
APGENCO (with 50% equity) and IL AND FS (50% equity) partnership. The proposed...
- was
unbundled into
Andhra Pradesh Power Generation Corporation Limited (
APGENCO) and
Transmission Corporation of
Andhra Pradesh Limited (APTRANSCO). APTRANSCO...
- AP24x7,
retrieved 19
January 2020 "Pulichintala
project progress report,
APGenCo".
Retrieved 15 May 2013. Srinivas,
Rajulapudi (14
February 2019). "Naidu...
- 550 sq mi) Surface area 616 km2 (238 sq mi)
Power Station Operator(s)
APGENCO(right bank) and TGGENCO(left bank)
Turbines 6 × 150 MW (200,000 hp) reversible...
- Total capacity 75
Tmcft @ F.R.L. +100.58M Catchment area 2.20862 km3 (1,790,557 acre⋅ft) Surface area 212.28 km2 (52,456 acres)
Power Station Operator(s)
APGENCO...